The Client

The Clients Problem

This government operated building had been suffering from water ingress problems for the past 10 years. Upon inspection we identified over 100 holes, splits and defects along with an incorrectly installed walkways which have pierced the underlying membrane.

 

Due to the daily operation of the building a roof renewal was not an option.

The Challenge

What We Did

The roof was cleaned of all debris using high pressure washers before applying Guardian Seamless Roof Coating & White Silicone Roof Coating.

 

Slabbed walkways were reinstated upon completion and professionally cleaned.

    Sorry, no posts matched your criteria.
Image
1
First Step

Assessing The Scope of Works

Image
2
Second Step

Cleaning & Preparation

Image
3
Third Step

Applying the Treatment

Image
4
Fourth Step

Relaid Paving Slabs